The landscape component for this exceptionally transformative project
will establish this new roadway connection from Interstate 490 into the heart of University Circle as
a “planned boulevard.” The lack of economic activity that had befallen this area in decades past will
be reversed as Opportunity Corridor will drive new traffic through it, bringing with it the potential
for growth, jobs, and better access between two major commercial hubs in Cleveland. Boulevard Studios
provided technical plans for the roadway enhancements on half of Phase 3, collaborating closely with a
partnering landscape architecture firm on the other half as well as project lead Michael Baker, achieving
successful completion of the construction documents at every project milestone.
Work on Opportunity Corridor involved working within a unique delivery system managed by the project
lead, adhering to specific ODOT formatting, and carefully following guidelines for the safe placement of
landscape material for particular speed limits, curve radii, and sight triangles.